Laserfiche WebLink
1�'�, <br />Jy <br />REQUEST FOR COUNCIL ACTION <br />Department Approval <br />Date: 06/29/2009 <br />Item No.: 7 j <br />City Manager Approval <br />Item Description: Approve bid for replacement of Pavers on Larpenteur Avenue Streetscape <br />BACKGROUND <br />The Larpenteur Avenue Streetscape pavers between Lexington (next to Keys Cafe) and <br />Fernwood Avenues (14,700 s.f.) have shown signs of deterioration the past few years. Installed <br />in 1999-2000, these pavers are "Holland North Oak Concrete Pavers" from the Anchor Slock <br />Company. A combination of outdoor exposure to the sun, salt, and freeze thaw cycles, have <br />contributed to the premature deterioration and crumbling of the sidewalk. Several efforts to <br />"spot" repair the bad areas by replacing deteriorated pavers with new pavers have worked to <br />some extent in the past, much of the area is now showing significant deterioration. Staff has <br />concerns about trip hazards that create significant liability issues due to the uneven nature of the <br />sidewalk. Additional spot replacement of various crumbling sections has become cost <br />prohibitive. <br />Secause the deterioration has become so severe and extensive, the only cost effective solution at <br />this time is paver replacement. Even though these pavers are 9-10 years old, Anchor Slock has <br />agreed to warranty the pavers, at no costto Roseville. We propose to replace 14,700 square feet <br />of deteriorating pavers from Lexington Ave. to Fernwood Ave. The replacement pavers, <br />"Holland North Oaks Plus Pavers", meet the latest ASTM Standard Test Method. This standard <br />covers the resistance to freezing and thawing of solid concrete interlocking paver units. The <br />Holland North Oaks Plus Pavers have a premium concentrated material at the top 3/8" of each <br />paver that produces a richer color, distinctive fine texture and better wear-resistant surface. <br />Secause Anchor block is providing all material at no cost, we obtained bids for the labor <br />required for this paver replacement project. <br />Discussion of Bids <br />We obtained three bids for this project. The low bid, submitted by Glacial Ridge, came in at <br />$63,651.00. In order to successfully complete this project, we need to add 5% to the total for <br />tree grates, fill material, etc. not provided by Anchor Slock. <br />The bids are as follows: <br />Name Bid er s.f. Total Cost Bid Plus 5% (misc.) Total Cost <br />Glacial Rid e $4.33 $63,651.00 $3182.55 $66,833.55 <br />Linwood Contractin , Inc. $4.50 $66,155.00 $3,307.75 $69,462.75 <br />DNI $5.10 $74,970.00 $3,748.50 $78,718.50 <br />Page 1 of 2 <br />