My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0629_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0629_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2012 2:55:26 PM
Creation date
7/28/2009 2:46:41 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POLICY OBJECTIVE <br />, It is our policy to maintain City streetscapes and pathways, while adhering to high safety <br />. standards; keeping residents and visitors safe is our highest priority. <br />. FINANCIAL IMPACTS <br />. The cost to the City of Roseville for this project is less than half of the total cost because Anchor <br />. Slock Company will be providing the pavers at no charge to the city. The cost to the City is for <br />. the labor, and miscellaneous materials. Staff recommends Glacial Ridge for this work as they <br />. are the low bidder at $63,651.00 and have extensive experience installing paver sidewalks. We <br />. estimate we will need an additional 5% to cover miscellaneous materials, for a total project cost <br />. of $66,833.00. These costs will be funded from the streetscape maintenance and pathways <br />. maintenance operating budgets. <br />STAFF RECOMMENDATION <br />� Staff recommends approval of a bid from Glacial Ridge to provide the labor to replace the <br />deteriorating sidewalk pavers at a cost of $63,651, plus 5% for miscellaneous materials for a <br />total cost of $66,833.55. <br />REQUESTED COUNCIL ACTION <br />� Motion to approve a bid by Glacial Ridge Co. to replace sidewalk pavers at a cost of $63,651, <br />� plus 5% for miscellaneous materials for a total cost of $66,833.55. <br />Prepared by: Steve Zweber, Street Supervisor <br />Gretchen Carlson, Maintenance Support Specialist <br />Attachments: A: Map <br />B: Pictures <br />C: <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.