Laserfiche WebLink
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />Date: 7/20/09 <br />Item: 7.h <br />• Current kitchen to meet caterers' expectations and to handle larger <br />groups of visitors <br />4) Replace OVAL Tarmac — Training Track <br />• Mill and blacktop perimeter of OVAL <br />• Eliminate cracks and potholes and create a smooth training surface <br />5) Sound System Upgrade <br />• Upgrade aging sound system to allow an "All-Call" for safety, control <br />and monitoring <br />• Improve communications throughout facility while minimizing sound <br />levels in adjacent neighborhood <br />6) Replace Skate Park OVAL Equipment <br />• Replace outdated wood equipment with new, weather resistant pieces <br />• Eliminate potential structural failures <br />7) Install Gas Heating and Snow Melt Pit at OVAL <br />• Create melting and heating area to increase efficiency when removing <br />or cleaning ice <br />• Minimize the need to operate heavy equipment while participants are <br />using the OVAL <br />8) Furnish Carpet in Olympic Room <br />• Carpet is nearing the end of its useful life <br />9) Geothermal Related Items for Facility <br />• If money remains from value engineering efforts <br />Specific Project Update <br />Item # 2) OVAL Scoreboard/Timing Mechanism/Electronic Marquee sign: <br />A Request for Proposal has been issued; two proposals have been <br />received, are being analyzed and it is anticipated to be ordered in July to <br />be installed prior to the November skating season. <br />Item #4) Replace OVAL Tarmac — Training Track: <br />Is contracted and is expected to be completed by the end of July and <br />ready for the winter season <br />All other projects are in the process of being researched, quotes obtained and <br />will be completed as they are finalized and appropriate. <br />All of these projects are anticipated to facilitate increased efficiency and enhance <br />use of the facility. <br />2 <br />