Laserfiche WebLink
� REQUEST FOR COUNCIL ACTION <br />.3 DATE: 10108107 <br />� <br />f� <br />� <br />S <br />i� <br />7 �] <br />11 <br />1� <br />].3 <br />�� <br />lb <br />1, <br />L 1� <br />L �J <br />�� <br />�I <br />�� <br />�� <br />�� <br />�� <br />�� <br />�.7 <br />�S <br />�c� <br />� i� <br />TTEM NO.: $.h <br />Depart ent ApprovaL• Manager Reviewed: Agenda Section: <br />� <br />r ' <br />Item Description: Approve Snelling/ County Road B Project quit claim deed for pathway easement. <br />Background: Mn/DOT has scheduled the constructionof a safety project on Snelling Avenue between <br />Rnselawn and Hwy 36 in 2008. They are going out to bid for this project in Januazy 2008, with <br />construction to begin as soon as feasible in the spring. This safety project for the Snelling and County <br />Road B intersection includes the following im�rovements: <br />. Addition of a northbound through lane on Snelling Avenue from a point just north of itoselawn Avenue <br />to TH 36 eastbound ramps. <br />. New signal at County Road B. The east and west legs of this signal are under Ramsey County <br />jurisdiction. Half of the cost of this signal is the responsibility of Ramsey County. <br />. Right turn lanes at County Road B and Snelling, on both east and west legs of the intersection. <br />. New Signal atthe Sl�illz�an/ HarMar/ Snelling Avenue intersection: The east and west legs ofthe signal <br />at �arMar and Snelling are under City of Roseville j urisdiction. Half of the cost of this new signal will <br />be the responsibility of the City of Roseville. This is a state aid eligible cost. Once the state has put <br />together cost share agreements for this intersection, Staff will bring them to the City Council for <br />approval. <br />3] As discussed above, the State will be constructing a right turn lane on the east and west leg of County <br />�? Road B and Snelling. Currently, the City has a 10 foot wide pathway easement in tl�e SW quadrant of <br />�� this intersection. In order to obtain the right- of- way necessary to construct this turn lane, they need it to <br />�� be free and clear of encumbrance. To accomplishthis, they have requested the City to convey this <br />�5 easement by quit claim deed to the State of Minnesota. <br />�� <br />3� Currently there is a pathway on the easement, the state will reconstruct this pathway on their right- af <br />�#C way as a part of the project. <br />�� Financiai Implications: There is no cost to the City for the reconstruction of t1�e existing pathway. The <br />�� pathway easement was originally obtained by the City in 1987. Only a portion of the easement is being <br />� l deeded to the State. <br />�? <br />�� <br />A� <br />�� <br />�� <br />RECOMMENDED COUNCIL ACTION: <br />Approve S�el�ingl County Road B Proj ect quit claim deed for pathway easement. <br />Prepared by: Debra Bloom <br />