Laserfiche WebLink
� <br />����� <br />5 �P 2 �' 2007 <br />� <br />September 26,2007 <br />Ms. Debra M Bloom <br />City Engineer <br />Roseville City Hall <br />2660 Civic Center Drive <br />Roseville, MN 55113 <br />Dear Deb: <br />I spoke with yon this afternoon concerning the proposed assessment amount for the <br />4wassa Boulevard Reconstruction Process. We own two properties — one (lot <br />#0129232I0012} borders �ou�h Owasso Boulevard but is undeveloped. The other lot (lot <br />#(}I2923210b11} has only a driveway access, with its rear dimension differing from the front <br />by more than 25%. <br />We have lived on the developed property for 26 years, and we have no intention of <br />selling the undeveloped lot at this time. We thus petition that these properties be considered <br />together in determining the assessment amount that we need to pay. Yon indicated that this <br />reassessment could decrease our total assessment. <br />Thank you for your assistance by phone and e-mail, and for your consideration of this <br />petition. <br />Sincerely, <br />Kathleen S. Kothenberger <br />� ��-- <br />��'� � .� <br />Da�id A. Rothenberger <br />. ..- - , •� - , . � , -��-- . . - �: _ � � .:f��. , . � . _ .. <br />_ . _ . . . ,,,.. . .�� � , � �.� � �. � � � -. • � . <br />- • i, � • � , � <br />� <br />0 <br />