Laserfiche WebLink
; These projects have been delayed for several years based upon a close <br />� evaluation each season. It is now definitely necessary to do the work. Following <br />Y are the ages of the existing equipment as well as the life expectancy of each: <br />�� Item Year Installed Expected Life <br />Y� Refrigeration Floor 1979 20 years <br />� Boards and Glass System 1982 20 years <br />� Condenser 1998 (used) 5-10 years from install <br />_ Chiller 1979 15-20 years <br />1� <br />1? The project work is anticipated to be done in late summerlearly fall of 2008 and <br />�� will take approximately ten weeks to complete. The arena is considered a year <br />�:� around facility that our affiliated groups and citizens rely on; however, this <br />i� appears to be the best time of the year to do these projects because the arena is <br />1� typically shutdown each year for a 2-3 week period in August for annual <br />1�� maintenance. This project will require a shutdown extension of approximately <br />1�' another 6-7 weeks. As a result there will be significant program impacts that will <br />1 k need to be worked through. Staffwill be working with user groups and Ramsey <br />1{r County rinks to attempt to coordinate ice time for them. The opportunity <br />� v cpstlre�enue loss is estimated to be approximately $60,000 for the extended <br />�_ shutdown period and has been planned for in the 2008 proposed budget. <br />{ L, <br />�� :. <br />� r] <br />25 <br />2� <br />� ' <br />�k <br />� �f <br />J� L <br />� :� <br />1� <br />.� �� <br />�� <br />-f L� <br />1 <br />��; <br />�� <br />�� <br />_}1 L � <br />�j ��: <br />�1 1 <br />�� <br />L <br />With this project some unforeseen circumstances may arise, i.e. high frost levels, <br />steel unavailability, chiller barrel corrosion greater than anticipated, more time to <br />make the initial sheet of ice, test well results, etc. If this occurs, the City will be <br />responsible for the additional costs associated with removing the frost and all the <br />testing that is associated with the sub grade preparation, change of direction with <br />steel issues, and new vs. refurbish chiller barrel, etc.. <br />POLICY OBJECTIVE <br />The proposed project and the use of professional engineers are consistent with <br />City �oliG}�pr�c�ti�� for repairslrer�ovatians/cans�ruciion that is necessary for the <br />City infrastructure. <br />The proposed project considers and compares the use of green technology vs. <br />conventional uses. <br />The proposed project considers and compares the financial implications of today <br />as well as in the future. <br />The proposed project considers Imagine Roseville 2025 initiatives <br />�.� FINANCIAL IMPLICATION <br />��i Depending on the approach, the project cost is anticipated to be $625,000 - <br />� `� $1,013,000. <br />r� �; <br />