Laserfiche WebLink
(EVP Syste�s), as a par� oi �he new Traf�ic C�ntrol Siqnal <br />i�sta��atia�s. <br />It is conside�ed i� the public's best interest fo� the <br />State �o p�nvide two new traffic signa� c�bine�s w��h can��ol <br />equipment �S�ate �urnis�ed Materials} to operate the new �ra�fic <br />Control Signals. <br />It is ant�ci�a��d �hat the Traf�ic Control Signals and <br />EVP 5ystems cons�ruc�ion is eligible for �ifty-�ix (56) �ercent <br />Federa�-a�d HTSP �unds, a�d if s�, t�e Co���y's and City's <br />respective Cons�ruc��on Cost shar� and Construction E�gineering <br />wi�� be red�ced by the amount of �edera� �unding received. <br />The County, the City and th���ta�e w��� p��tici�ate in <br />the cost, main�e�a��e a�d operation of �he temporary and new <br />Traf�ic Control Signals a�d �VP �ys�ems. <br />CONTRACT <br />l. The ��a�.e w�.�.�. prepare the n�cessary p1an, <br />specifica�iaras and propo�al, jPreliminary ��.gine�ring). The <br />�tate wi�� also perforrn all neces,sa�y const�u.cta.az� inspection, <br />(Construction Engine�ring). <br />2. The Cost of Construction, (Con�truction Co��) <br />cQnsists o� �he contract cp�t o�' the work ar, i� the work�is not <br />contracted., the ac�u��. �ost of a11 �.abor, materia�.s, and <br />equiprr�en� ren�al req��.red �o complete the work. A Pre�.iminary <br />SCH�DU�E "I" is attached and incorporated into �his Agreement. <br />The Prela.m�nary SCH�l�t.7L� "z'� �.�.c�.udes a11 Cc�un�y and City > <br />�- 3 w <br />90216R <br />