My WebLink
|
Help
|
About
|
Sign Out
Home
2007_0312_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2007
>
2007_0312_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2012 12:37:15 PM
Creation date
8/26/2009 3:20:29 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION AGREEMENT <br />2007 Mill and Overlay Project <br />This Agreement is made on , between the City of Rasevzile, a <br />Minnesota municipal corporation("Roseville"), and the City of Arden Hills, a Minnesota <br />municipal corporation ("Arden Hills"). <br />1. PURPOSE <br />Roseville and Arden Hills (Collectively the "Cities") have determined that it is in the best <br />interests of the residents of each city �o undertake in a cooperative fashion their 2007 Mill and <br />Overlay Project (the "Project"). The goal of the Cities is to provide for a coordinatedcost <br />effective completion of the Project and the associated benefits of economy of scale. The purpose <br />of this agreement is to set forth the terms governing the design and construction of the Project. <br />2. PROJECT <br />2.1 The Project shall consist of the facilities identified in Exhibit A hereto, subject to <br />modification as provided herein. <br />2.2 The costs of the Project will be paid by the Cities as provided in Section 5.1 <br />hereof. <br />3. DESIGN <br />3.1 Roseville, will prepare, or have prepared, engineering drawings, specifications <br />and construction plans for the Project. The construction plans will include a cost estimate. The <br />final cost estimate will include all costs associated with the Project as well as a contingency <br />budget for unforeseeable circumstances associated with the construction. Roseville will comply <br />with any requirements of Minnesota law with respect to approvals of such plans and <br />specifications. <br />3.2 Construction plans, engineering drawings, specifications and cost estimates will <br />be submitted to each city for the approval of each city council. <br />4.1 CONSTRUCTION <br />4.1 If final construction plans and specifications are approved by each city council, <br />Roseville shall proceed with construction of the Project. Roseville will advertise for bids in <br />accordance with the requirements of the municipal contracting law. <br />4.2 Prior to awarding construction contracts Roseville will review the bids received <br />with Arden Hills. If the contracts exceed the cost estimates contained in the construction plans <br />(including a contingency budget) previously approved by the Cities, the bids must be approved <br />by each city council or the project may not proceed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.