My WebLink
|
Help
|
About
|
Sign Out
Home
2007_0312_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2007
>
2007_0312_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2012 12:37:15 PM
Creation date
8/26/2009 3:20:29 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'? � <br />�� <br />�5 <br />� �; <br />� �, <br />� <br />L� <br />�� <br />i �[7 <br />� �� <br />1�� <br />1�? <br />1�� <br />1 �7 � <br />� � �� <br />1�r <br />1 l_� C� <br />1 � �' <br />11 C7 <br />�1� <br />tl� <br />113 <br />11� <br />11 !� <br />� r k� <br />�_� <br />f1C <br />il7 <br />1 � [7 <br />1 �.1 <br />i�� <br />1�? <br />1�� <br />12� <br />1�� <br />1� � <br />1 � Cs <br />� � `� <br />1 �r7 <br />1;31 <br />1;3 � <br />13.? <br />13� <br />13� <br />FINANCIAL IMPLICATION <br />The estimated project cost was $460,000 -$535,000, including the south entry <br />a�difiionlremadel, restroorr� addiiianlremo�e� and the basement excavation. <br />V�(th approximately $40,000 of the $500,000 state bond fund proceeds reserved <br />for the architecturallengineering fees thee is $460,000 remaining for the project. <br />V�(th the low base bid at $403,000, alternate #� at $84,900, alternate �2 and #5 <br />at $40,100, a anticipated sewer and water connection fee of $5,000 and a project <br />contingency of approximately 3% ($16,000) the total proposed project cost is <br />$549,000. <br />Available from the state bond proceeds is $460,000 and the remaining $89,000 is <br />availablefrom the city building replacementfund. <br />STAFF RECOMMENDATION <br />Based on the bid results, recommendation of the Rosevilie Parks and Recreation <br />Commission, Skating Center Advisory Committee and the result of the public <br />input sessions, staff recommends that the i�oseville Skating Center projects for <br />the south entryway additionlimprovements, the restroorr� additionlremodeling <br />project and the identified alternates be approved as presented. <br />The contractor has supplied the necessary bond and is qualified to provide the <br />necessary work. <br />COUNCILACTION REQUESTED <br />1) Motion authorizing the acceptance of the base bid (south entry <br />addition/remo�el) in the amount of $403,000 and awarding the contract to DNR <br />Construction as the lowest responsible bidder. <br />2) Motion authorizing the acceptance of alternate #9 (restroom addi�ionlremodel) <br />in the amount of $84,900 and awarding the contract to DNR Construction. <br />3) Motion authorizing the acceptance of alternate #2, #5 in the amount of <br />$40,100 and awarding the contract to DNR Construction. <br />4) Motion authorizing 3% of the total project cost equaling $16,000 as available <br />contingency. <br />5) Motion authorizing the SewerlWa�er connection fees of $5,000 for the project. <br />6) Motion to reject alternate #9 ,#3, #4, #6, #7 and #8 at this time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.