My WebLink
|
Help
|
About
|
Sign Out
Home
2007_0326_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2007
>
2007_0326_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2012 12:38:43 PM
Creation date
8/26/2009 3:20:48 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_� <br />_� <br />_� <br />.$ <br />_� <br />1 �1 <br />EI <br />AdditionalBi��itratioz� basin construction: During the course of getting the Rice $18,572.19 <br />Creek and Capitol Region watershed district permits, the Cities were required to <br />install additional storm sewer facilities in the boulevards on Roselawn. Two <br />additional biofiltrationbasins were constructed to accommodaterunoff from the <br />road. They are located at NE comer of Asbr�y and Roselawn and the SE comer of <br />Hamline and Roselawn. This cost is shared by Roseville and Falcon Heights. <br />Additional Storm sewer construction: We identified a number of areas on the $25,380.00 <br />Roseville side of the road where it was necessary to extend the storm sewer pipe in <br />order to collect runoff from backyards trapped in the low areas behind the curb. <br />This would be aid for b Roseville. <br />Total Cost overruns $79,70691 <br />While the total change orders and major cost overruns for this project was $79,70691, the actual <br />increaseto the contract was $62,401.65. This was the result of other project quantitiesbeing less <br />than what was anticipated. Even with these additional costs for this contract, we still are <br />substantially under the engineer's estimate presented as a part of the feasibility report, <br />$1,131,996.54. As a result, we do not anticipate that this should adversely impact the proposed <br />assessments. The costs for this contract will be paid for using Municipal State Aid funds, utility <br />funds and assessments. Since this is a border street, half of the street reconstruction costs are <br />being shared with Falcon Heights. St. Paul Water Utility replaced their watermain as a part of <br />this project. A funding summary: <br />Roseville MSA funds $327,650.73 <br />Roseville Assessments $53,859.62 <br />Roseville Watermainfund $99,417.00 <br />Roseville Sanita Sewer fund $23,450.00 <br />Falcon Hei hts MSA funds $347,635.25 <br />Falcon Hei hts Assessments $8,495.11 <br />Saint Paul Water Utili $39,766.00 <br />Total $900,273.70 <br />��� <br />13 Staff recommendation: Since all nec�ss�r'v items have been completed in accordance with <br />I� proj ect plans and specifications, staff recommends the City Council approve a resolution <br />a� aceepting the wark com�leted as2006 Contract A: Roselawn Avenue Reconstruction Proj ect and <br />] � authorize final }�w��:rrt of $43,031.38. <br />]� <br />] �S <br />19 <br />�0 <br />�l <br />�� <br />�� <br />�� <br />�� <br />�� <br />RECOMMENDED COUNCIL ACTION: <br />Approve Change Orders for 2006 Contract A: Roselavv� Avenue Reconstruction Project <br />and <br />Approve the resolution accepting the wark completed as 2006 Contract A: Rosela�wn Avenue <br />Reconstruction, starting the on�year warranty and authorizing final payment of $43,03138. <br />Prepared by: Debra Bloom <br />
The URL can be used to link to this page
Your browser does not support the video tag.