Laserfiche WebLink
36� <br />3�� <br />36� <br />��� <br />3�9 <br />3�� <br />��1. <br />37� <br />��� <br />�7� <br />3�� <br />��� <br />��� <br />��8 <br />�7� <br />38� <br />��h <br />�B� <br />�83 <br />�� <br />��� <br />38� <br />��� <br />38� <br />3��d <br />�� <br />��� <br />3�� <br />3�� <br />3�� <br />3�� <br />��� <br />3�� <br />3�8 <br />��9 <br />��0 <br />��i <br />��� <br />��3 <br />��� <br />1. Energy Audit: <br />Proposal Form <br />� <br />�, <br />2. Feasibility study for a conceptual design for a system at the Indoor 1ce Arena: <br />�. <br />3. Feasibility study of the conceptual design for the possible future conversion of the <br />OVAL: <br />� <br />4. Feasibility study for the conceptual analysis of the HVAC needs for the entire City <br />Hall Campus, including the City Hall Facility, Public Works Facility and Fire Station 'l. <br />This portion of the study will include enough information to determine any future viability <br />and payback of a phased conversion to alternate energy for all facilities. This portion of <br />the study will be completed if funds are available: <br />Company: <br />Submitted By: <br />Signed: <br />��� Date: <br />$ <br />