My WebLink
|
Help
|
About
|
Sign Out
Home
2007_0611_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2007
>
2007_0611_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2012 12:41:17 PM
Creation date
8/26/2009 3:26:09 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 r: � <br />lv <br />1�LL <br />}� r <br />� �� <br />1�� <br />1?� <br />1 � _. <br />� <br />7�t <br />1��_ <br />��� � <br />��; <br />,-;�1 <br />17 �} <br />� C; r � <br />1�1 <br />l�? <br />T� �� <br />1 �?�� <br />18 =. <br />1�' v <br />1 �� � <br />1 �3 ;� <br />1 � �: <br />I � �,i <br />1�i <br />1 �% <br />���:L <br />1��: <br />1�� <br />34E <br />1 S" i <br />I��. <br />i � �� <br />� �� <br />� �,� � <br />� ��: � <br />� �;' .3 <br />204 <br />205 <br />206 <br />207 <br />208 <br />209 <br />210 <br />211 <br />212 <br />GUIDANT J(.7I�Nl�OS`,E MINNESOTA OVAL <br />�_ Install Facility Monitoring Equipment $ 50,000 <br />• Install security cameras to monitor activity throughout facility especially at building access <br />points <br />� Maximize staffing efficiency and effectiveness by directing staff to needed areas <br />?_ OVAL �corebaard/Tim�r�g Mechanism Replacement $250,000 <br />� Current technology is outdated and expensive to maintain <br />� Provide better service for regional, national and international events <br />� Expand marketing opportunities <br />�. Renovate Banquet Facility Kitchen � 25,000 <br />� The renovation would move the walk-in cooler to the existing storage space ne�t to the <br />kitchen for easier caterer access in one room. It would be more convenientfor the caterers <br />and less disruptive for the users. <br />• Cur�'��at kitchen to meet caterers' expectations and to handle larger groups of visitors <br />�#, Replace OVAL Tarmac — Training `�'rac��. $100,000 <br />* Mill and blacktop perimeter and driveways of OVAL <br />� Eliminate cracks and potholes and create a smooth training surface <br />�, Sound System Upgrade � 55,000 <br />e Upgrade aging sound system to allow an "All-Call" for safety, control and monitoring <br />* Improve communications throughout facility while minimizing sound levels in adj acent <br />neighborhood <br />�i. Replace Skate Park OVAL Equipment <br />• Replace outdated wood equipmentwith new, weather resistant pieces <br />Eliminate potential structural failures <br />', Replace OVAL rink divider pads <br />* Replace aging pads used to divide infield from track activities <br />� New pads provide latest materials to prevent injury <br />� 65,000 <br />� ��t� <br />8. Install Gas Heating and Snow Melt Pit at OVAL � 85,000 <br />• Create melting and heating area to increase efficiency when removing or cleaning ice <br />� Minimize ��e need to operate heavy equipment while participants are using the OVAL <br />9. Replace Carpet in Olympic Room <br />4 Carpet is nearing the end cf its useful life <br />Total <br />$ 30,000 <br />$695,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.