My WebLink
|
Help
|
About
|
Sign Out
Home
2006_0410_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2006
>
2006_0410_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 1:02:16 PM
Creation date
8/26/2009 3:33:29 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting — 03/27/06 <br />DRAFT Minutes - Page 10 <br />recently-elected Councilmember for the City of Mahtomedi. improvement <br />Public Worlcs Director Duane Schwartz reviewed the <br />background of the County Road C Reconstruction Project, noting <br />that the first phase had consisted of the roadway between Long <br />Lake Road and Snelling Avenue with construction started in <br />2005 and nearing completion. Mr. Schwartz advised that the <br />second phase would construct the roadway between Snelling <br />Avenue and Oxford Street and was proposed to start this <br />summer. <br />Mr. Schwartz noted that the two projects described in the <br />feasibility report originally presented to the City Council in <br />March of 2005 consisted of Ramsey County roadway <br />reconstruction, followed by the Roseville Streetscape project, <br />with both limited to the area between Snelling Avenue and <br />Oxford Street. <br />Mayor Klausing opened the Public Hearing at 6:3$ p.m. <br />City Engineer Deb Bloom noted that numerous information <br />meetings had been held with property owners regarding County <br />Road C over the last five years. Ms. Bloom noted that, while <br />closely related, the reconstruction project and the streetscape <br />project both had different funding sources and schedules. <br />_ Ramsey County Engineer Dan Soler reviewed the reconstruction <br />— project consisting of replacement of existing pavement <br />constructed to accommodate five lanes if future additional <br />capacity was warranted, with current roadway widening, addition <br />of a two-way center turn lane or median as applicable, addition <br />of right turn lanes at Hamline and Lexington Avenues at County <br />Road C to improve intersection capacity, as well as adjustments <br />to signal timing to ensure optimum efficiency. Mr. Soler <br />reviewed related storm water improvements (i.�.� rain gardens <br />and stoz-m water infiltration basins); the proposed installation of <br />temporary fencing along the south side of County Road C to <br />separate the construction zone from the pathway, allowing for <br />use of the pathway during the summer; installation of a sidewallc <br />along the north side of the roadway; and restriping lanes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.