Laserfiche WebLink
Summarv of Contract Chanaes: <br />Items A through L(replace piping system): <br />item L (re-insulate piping system): <br />It�m M (delete steel framework): <br />Item p (delete building permit): <br />Total <br />Increase to Contract Price: <br />Original Contract Price: <br />Current Contract Price: <br />Contract Price with this Change Order: <br />$95,800.00 <br />$22,000.00 <br />($8,415.00) <br />($1 1, 80.40) <br />$108,204.60 <br />$ 1 ���4 �� <br />� �$3,82�.�0 <br />� �3,�2�.�� <br />$ 392,024.60 <br />Increase to Project Completion Date: �� Working Days <br />Recommended for Approval by: <br />Engineer: Stevens Engineers. lnc. <br />� � '����:.i � , <br />p�: —��l �� � I�.� r ' �._ <br />Name Date <br />This Change Order is agreed to by the Owner and the Contractorthis Day of September, <br />2005 <br />Contractor: Cool Air Mechanical, Inc. <br />r <br />{� f -• I� � � <br />gy: 4 �` � r,L ri�r = ��� I � ��.i � �— �t�. f {c'• �'. .s <br />y <br />Name Date <br />Its: <br />Owner: Gifv of Roseville. Minnesota <br />__ � � �, + <br />��. J I r •4� � � T � <br />�I� . , �- ��k� <br />i . {- <br />�`' . 1'�i.l �. �'4�' •, `_�' � rM1 � �~ � �t' � .. <br />C: Owner <br />Contractor <br />Bonding Company <br />Stevens Engineers, Inc. <br />r�,c�,� rxt�r r,�, � �� � <br />