My WebLink
|
Help
|
About
|
Sign Out
Home
2006_0710_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2006
>
2006_0710_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 9:33:12 AM
Creation date
8/26/2009 3:37:32 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Replace the shaft seal on compressor N�.i, The cost of the additionalwork is $1,660.00 <br />Change to Contract Price: <br />Original Contract Price: <br />Current Contract Price: <br />Contract Price with this Change Order: <br />$ 6,127,40 <br />$ 283, 820.00 <br />$ 389, 636. 90 <br />$ 396,364.30 <br />Increaseto Project Completion Date: �:r Working Days for all ite�ns. <br />Recommended for Approval by: <br />Engineer: Stevens Enaineers. Inc. <br />��.. �5 � �' �.�.,� �•� � �r-�� _ <br />�I��� G �1� <br />This Change Order is agreed to by the Owner and the Contractor this 29 Day of December, 200� <br />Contractor: Cool Air Mechanical, Inc. <br />�x <br />f' � <br />gy. �-���=�:: �_ � � �–��-_�. � {� � � �� <br />��J �r.ue ��� <br />Its: �'��� t,� �T <br />— Owner: City f oseville Minnesota <br />� � .. ,�/ � �� � <br />By: _ <br />��� <br />Its: .���' � � <br />C: Owner <br />Contractor <br />Bonding Company <br />Stevens Engineers, Inc <br />Change0rderNo.3 Page2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.