Laserfiche WebLink
is�. <br />� <br />� t ���� t� <br />���'r�� �k.�•I�� <br />DATE: <br />OWNER: <br />CONTRACTOR: <br />BOND COMPANY <br />CHANGE ORDER N0. 4 <br />JOHNROSEOVAL <br />REFRIGERATION SYSTEM REPAIRS AND IMPROVEMENTS <br />ROSEVILLE. MINNESOTA <br />Our File No 6024 <br />February 17,2006 <br />City of Roseville, Minnesota <br />Cool Air Mechanical, Inc <br />United Fire and Casualty Company, 118 2�a Ave. SE, PO Box 73909, <br />Cedar Rapids, IA 542407-3909 <br />AGREEMENT DATE: June 23,2005 <br />Description of Work: <br />The following changes are hereby agreed to between the Owner and the Contractor: <br />A. Replace the existing Vilter three way valve on the high pressure receiver. The valve shall meet <br />the requirements of the project specifications. Work shall include the removal and disposal of <br />the existing valve, the installation of a drip leg, removal andlor storage of existing refrigerant <br />and all other materials and labor required to complete the work. The cost of the additional <br />work is as listed below: <br />1. Labor: 6 hours at $103.56 per hour =$621.00 <br />2. Materials: Pipe, fittings, 3 way valve =$185.62 <br />— 3. Truck charge T $35.00 <br />Total = $841.62 <br />B. Test oil samples on two compressors. Submit test reports to Owner and Engineer. The cost of <br />the additional work is $50.00 <br />Change to Contract Price: <br />Original Contract Price: <br />Current Contract Price: <br />Contract Price with this Change Order: <br />� ���.�� <br />3 ���.��,�� <br />$ 3��,�6�,�1} <br />$ 397,255.92 <br />Change Order No. 4 Page 1 <br />