Laserfiche WebLink
less width and square footage than others in the general vicinity, it is not a <br />departure �past Council action. The Community Development Staff has <br />determined that a lot size and shape for Parcel "�", if granted, will not alter <br />the essential character of the locality, nor adversely affect the ptt�lic health, <br />� safety, or general welfare, of the city or adjacent properties. <br />6.0 RECOMMENDATIONS: <br />6.1 The Community Development Staff recommends: <br />A, approval of a 892 s.�`. lot size variance to Section 1004.016 (Residential <br />Dimensional Requirements) for new Parcel "B". <br />B. approval of a minor subdivision to allow the creation of one substandard <br />residential parcel for property located at 1822 Dale Court. <br />The recommendations are based on the findings in Section 5 of the proj ect report dated August 3, <br />2005 and the following conditions: <br />a. The City policy is to require payment of the Metro Area Sewer Availability <br />Charge (SAC) upon the issuance of a building pennit. Tn this case, a$1,500 SAC <br />fee is required and will be collected with the issuance of a building permit for <br />Parcel "B". <br />b. The applicant must record the two lot minor subdivision survey within 60 days <br />after the approval of the City Council. Public utility and drainage easements of 5 � <br />feet are required on the sides and rear lot line. <br />c. For Parcel'B", the applicant must apply for and receive a Dale Court driveway <br />access permit from the Rc�sevil��; Public Works Director prior to issuance of any <br />---- building or grading permit. The existing looped driveway must be removed as past <br />of the building permit, or the owner of Parcel B must provide an access easement <br />for conti�i�ted use of the driveway by the owner of Parcel A, It the looped drive is <br />to remain, the access easement �nust be submitted as part of the building permit <br />application. <br />d. A grading plan, soil borings, and the survey {'B" above) illustrating lot lii�es and <br />house setbacks must be submitted with the building permit application. <br />.... e. Wit1�i�� thirty (30) days after approval by the City Council, tl�e applicant shall ----- <br />� supply the final survey to the Community Developme��t Director for review and <br />approval. A certificate of survey shall be required on all proposed parcels. After <br />completion of the review and approval by the City Manager, the survey shall be <br />___ recorded by tlie applicant with the Raa�sey County Recorder within sixty (60) <br />� days. Failure to record the subdivision within sixty (60) days shall ��ullify the <br />approval of the subdivision. (Ord. 1171, 9-23-i996) .._. <br />RCA PF35S5(082205} -Page 5 of 12 <br />