My WebLink
|
Help
|
About
|
Sign Out
Home
2006_1023_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2006
>
2006_1023_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 3:54:31 PM
Creation date
8/26/2009 3:40:05 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR COUNCIL ACT10N <br />Department Approval: Manager A�aved: <br />r; � ,�� <br />� <br />Date: 10123106 <br />Item #: 9. <br />Agenda Section: <br />€�C��,; � ir.�ti t�:s T���ir���� <br />Item Description: �../ <br />City Manager Search Progress Report & Consideration of Process Next Steps <br />Backeround: <br />During the July 24t�` meeting Council selected one of four options to move forward with the process to <br />hire the next City Manager. Under the approved option City Council named ��dona Bacon as the <br />project lead and established a budget of approximately$12,000 to work with. <br />During the August 28`� meeting Council approved the advertising brochure to be utilized as well as a <br />general t�meline for the process. In meeting with this ti�e���.e staff as posted the position and <br />advertised with the League of MN Cities, Star &Tribune, govjobs.corri, and ZCMA. The cost for this <br />advertising has been approximately $1,525. <br />Eight external panelists and eight internal panelists felt to be most involved in the community and <br />those who could bring pertinent knowledge and background to the selection process have been <br />confirmed with Council support. These panelists will conduct their interviews on November 17,2006. <br />The application deadline was on October �"'' at which time the 21 applications received were couriered <br />to PDI the executive search firm that was awarded the bid in September. Harry Brull from PDI is <br />currently reviewing and narrowing the candidate pool to the top ten and will be meeting with Council <br />on October 315� at 4:00 in special session to again narrow the candidates to those finalists selected for <br />interviews. <br />Per an emai� sent to Council on October �" regarding travel expenses due to the large number of out of <br />state applicants, Council responses supported moving Council interviews up to November 16, 2006 <br />with a public forum or social to also be conducted that day as well to minimizeprocess expenses. <br />Council also in this email expressed support to have any newly appointed Council members to sit in on <br />the November 16�� interviews in an advisory capacity. However, Council still needs to provide <br />direction around interview times and whether Council wishes to conduct interviews by panel or <br />individually as well as direction with regard to the details of the public forum or social. <br />Panelist and candidate interview packets are currently being developed and will contain information <br />surrounding the process and the City. These will be sent out once Council makes their selection of the <br />�'��a��s�s on October 315t <br />Council must still decide which finalists to test, what type of testing to conduct, and who will conduct <br />the testing. Staff is currently researching the marketplace with regard to available testing and cost. <br />Staff will provide an update to Council surround this as soon as it is readily available. <br />
The URL can be used to link to this page
Your browser does not support the video tag.