Laserfiche WebLink
the geothermal technology it would make sense to delay the traditional replacement method <br />for one year and study the geothermal fc�.her and fully understand the risks vs benefits. A1: this <br />time it would mal{e sense to hire an independent consultant to assist in conducting a stringent <br />feasibility study, verify numbers and analyze risks. <br />Basic General Ouestions that Remain <br />1) Shall the City continue to study the geothermal technology? <br />2) Shall the City hire an independent engineer to verify feasibility of the geothermal <br />technology in our replacement situatian? <br />3) Shall the City simply replace in a traditional method? <br />4) Shall the project be delayed until 2008 in order to study f-ur�her wiih an independent <br />engineering firm? <br />5) Due to the age of the system and need for replacement ;� we prepared in the event of <br />a mechanical failure? <br />6) What payback period is acceptable? <br />7) What is an acceptable up froni cost? <br />� Page 3 <br />