Laserfiche WebLink
Regular City Council Meeting <br />Monday, August 17, 2009 <br />Page 11 <br />Nays: None. <br />13. Business Items - Presentations/Discussions <br />a. Discuss Sidewalk Request for Dale Street, north of County Road C <br />Public Works Director Duane Schwartz reviewed staff's analysis of the petition <br />received on October 7, 2008, and signed by a number of residents adjacent to <br />Dale Street, north of County Road C and the surrounding neighborhoods, encour- <br />aging the City to install a sidewalk or pathway adjacent to Dale Street from <br />County Road C to South Owasso Boulevard. Staff's analysis was detailed in the <br />Request for Council Action dated August 18, 2009, and based on the City Coun- <br />cil's directive to staff at a recent meeting. <br />Mr. Schwartz reviewed the petition; current City assessment policy; State Statute, <br />Chapter 429 provisions; priority level of this section in the City's Pathway Master <br />Plan; staff support for identifying funding for this vital link in the system; condi- <br />tion of Dale Street in this area based on Pavement Index ratings; and consultations <br />with the City Attorney on area-wide assessments for larger and broader transpor- <br />tation type projects versus proving benefit for this type of project. <br />Mr. Schwartz reviewed staff's summary of the City Assessment Policy, with no <br />assessments for sidewalks at this time; however, noting that the City could vary <br />from this policy at its discretion. <br />Mr. Schwartz noted that staff did not recommend building a sidewalk prior to the <br />proposed major roadway construction, slotted for Dale Street in 2013. Mr. <br />Schwartz advised that, with continuing deterioration of this roadway, staff could <br />recommend that the project be moved up to 2011 from the original Capital In- <br />vestment Plan (CIP), and move Victoria Street to a later date, as it was deteriorat- <br />ing at a less severe rate. Mr. Schwartz noted that both Dale and Victoria were the <br />remaining two turnback roads from the county that had yet to be reconstructed. <br />Mr. Schwartz addressed the availability of Minnesota State Aid (MSA) funding <br />available in 2011; previous Council action for advance encumbrance of MSA <br />funds for street improvements as applicable; and the proposed process for initiat- <br />ing this project. Mr. Schwartz advised that, if the Council so directed reconstruc- <br />tion in 2011, which would include sidewalk and/or pathway construction, that <br />staff would propose preliminary surveys this fall, meetings with residents over the <br />winter months to develop the project, and returning yet this fall to the City Coun- <br />cil with a request for a Feasibility Study for 2011 construction, in accordance with <br />the Chapter 429 assessment process. <br />Discussion among Councilmembers and Mr. Schwartz included staffls opposition <br />to recommending a sidewalk be constructed as a stand-alone project, to later be <br />torn out as the roadway was reconstructed; prioritizing Dale and Victoria Streets; <br />