My WebLink
|
Help
|
About
|
Sign Out
Home
2005_0110_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_0110_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 10:10:45 AM
Creation date
9/14/2009 9:58:58 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARK LAND: <br />�a. l� The Master Site Plan requires that the redevelopmentproject provide or improve neighborhood <br />parks with land, recreational amenities, and/or cash-in-lieu of land dedication. The park plan <br />must also receive reviews by the Parks and Recreation Commission and staf£ The proposal <br />submitted by Rottlund Homes includes extended green space linkages and trails from Langton <br />Lake Parlc. The Developer will seek comment and provide an update to the Commission on <br />January 5,2005. The Commission's draft recommendation is attached. <br />TOWN HOMES. LOFTS, GABLES HOUSING: <br />�_ I � The town home proposal will consist of 490 units of several different styles. Access to the <br />garage areas, either tuck-underor underground garages, will be provided on the sides of the <br />townhome sites. These 490 townhome units will be rezoned within the PUD with an <br />underlying dimensional requirement of B-6 zoning (Mixed Us e Business Park District) <br />but with use requirements more typical of an R-6 zone (Townhomes District). <br />C�. f� The setbacks are in the site plan and will be set forth in the Final PUD Agreement and will be <br />similar to current R-3 and R-6 setbacks. <br />�.1 � Each walkup unit will have a slightly elevated main floor entry meaning the garage in the rear is <br />slightly recessed because of the grade. Stairs will bring residents and guests up to the main <br />entry door in typical fashion of a"row home". Each unit will have a second floor as well, with <br />an average height of 28 feet from grade to the midpoint of the roof. Units will include entry <br />porches and rear decks over a portion of the garage. <br />SENIOR M��KET RATE CONDOMINIUMS: <br />�_ l� The senior project will also have 240 units within a 4 four story structures. One senior complex <br />is generally situated south of the Parl�vay and east of Prior. The other complex is north of the <br />Parl�vay and east of Prior. There is underground parking and surface parking at each complex. <br />�_ 1� The setbacks are in the site plan and will be set forth in the Final PUD agreement, and <br />generally follow the general dimensional requirements for a B-6 zoning district, but with <br />uses limited to those typically in an R-3 zoning district. <br />�_ `� Vehicles will enter the site via the private driveways extending from either Prior or Arthur <br />Street from which vehicles will either park at grade or enter the underground pazking garages of <br />the structures. <br />�. L� Each complex will have 40 or more on site, at grade parking spaces. <br />�.1$ The area surrounded by the pazking, private drive, and building access/parking will include <br />park-lil{e amenities including wall�vays, benches, a gazebo, and possible recreational amenities <br />like a horseshoe pit and shuffleboard. <br />PF3595_RCA Twin_Lakes_General_Concept_Ol 1005 page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.