Laserfiche WebLink
PROPOSED BY ELIZABETH LUECK, 2599 FRY STREET <br />Accountability. A better approach would be to open the crossing <br />immediately and perform the traffic study with the crossing open. <br />The traffic study should include all of the accesses to the James <br />4" Addition, as welL When the results are determined, present <br />them at a public hearing and if I��n1DOT still wishes to close the <br />median, find a way to accommodate those residents, business <br />owners and business customers accordingly. Accommodation <br />should include significant improvements to mitigate impacts to <br />the other access points to the neighborhood and construction of a <br />new access point to County Road C at Lincoln Drive. In any case, <br />the median should remain open until the County Road C <br />reconstruction proj ect is complete and improvements are made to <br />the James ��' Addition accesses. <br />