Laserfiche WebLink
Step 6— Evaluate �t� Feasibility of Connectingthe RSVC Arena to the John Rose Oval's <br />Refrigeration System. <br />If this option is selected the evaluation will be performed beiween Steps 2 and 3 listed above. <br />During this step v� will: <br />■ Evaluate the feasibility of connecting the RSVC ice rink floor to the John Rose Oval's refrigeration <br />system <br />Write a letter report including and discussing the following: <br />A general description of the iwo facilities (RSVC Arena and the Oval) and the refrigeration <br />demand requirements including evaluating the existing refrigeration capacityof each <br />facilities and the required refrigeration capacity if the iwo facilities are combined. <br />Evaluation of physical obstacles such as the distance between the Oval's refrgeration <br />system and the RSVC Arena and its effect on system efficiency and construction costs. <br />Evaluation of seasonal demands on the common refrigeration system including <br />determining if the Oval's large refrigeration system can adequately and efficiently serve a <br />single ice sheet application during the summer months. <br />Estimate of probable construction costs for the piping connection between the Oval's <br />refrigeration system and the RSVC Arena and all required modifications to the Oval's <br />refrigeration system to accommodate this addition. <br />Evaluation of the existing direct refrigeration system package currently serving the RSVC <br />Arena and recommendationsfor improvements or replacementoptions including <br />improvements to the existing package system, replacementwith a like system, and <br />replacement with an indirect system. Estimates of probable construction costs for all of <br />the options discussed will be provided. This information will allow the City to evaluate all <br />of the options for renovating the RSVC ice rink floor and equipment. <br />, Estimate of probable construction costs for the ice rink floor replacement in the RSVC <br />Arena with a like direct system design and an indirect system design. <br />Review the findings and cost estimates with the City. <br />� If the option of serving the two facilities with a common refrigeration system is determined feasible and <br />the City approves this option v� will provide the City with a revised design proposal to include this <br />change based on the determined scope of the project. If ihe City approves other recommended <br />improvements to the RSVC Arena we will provide the City with a revised design proposal based on the <br />scope of the project(s). <br />Mr. Lonnie Brokke, Directorof Parks and Recreation <br />January 26.2005 Page 5 of 7 <br />