My WebLink
|
Help
|
About
|
Sign Out
Home
2005_0228_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_0228_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 10:13:41 AM
Creation date
9/14/2009 9:59:41 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Shafer Contracting shall erect silt fencing around the periphery of the parcel as a <br />"best management practice"to control potential stockpile erosion during in the <br />event of a rain storm. <br />c. Water and dust palliatives shall be used to control dust from trucks and gravel <br />processing. <br />d. Street sweeping shall be used as necessary or as required by the Public Works or <br />Community Development Department (per the City Street Cleaning Policy – � <br />attached) to reduce dirt from affecting adjacent roadway surfaces. � <br />i <br />e. Truck hauling of material to be recycled and that to be replaced as base material, ' <br />and the hauling of concrete for the new roadway surface shall utilize the Terminal <br />Road to Long Lake Road to County Road C route. Empty trucks returning to the <br />operation site and those trucks hauling materials necessary for the project, <br />including aggregate, cement and water, shall be allowed to use Walnut Street, <br />Cleveland Avenue, and Fairview Avenue. However, during the City's mill and <br />overlay project, Walnut and/or other appropriate routes will be allowed. <br />f. Hours of operation shall be limited from 7:0� .a.m. to i 0:00 p.m. weekdays and <br />7:00 a.m. to 4:00 p.m. on weekends. <br />g, The Interim Use Permit shall be allowed for a period of one year of from April <br />2005 to August 2006, unless otherwise requested by Shafer Contracting three <br />months prior (May 24, 2006) to this expiration date. <br />7.0 PLANNING COMMISSION ACTION: <br />7.1 On February 2,2005, the Roseville Planning Commission held the public hearing <br />regarding the Shafer Contracting request. At this meeting no citizens addressed the <br />Commission. However, the Commission did have questions of the applicant, the City <br />Planner and the City Engineer. <br />7.2 Chair Mulder asked what was done with the re-bar and other non used byproduct. Scott <br />— Spisak, Shafer Contracting indicated that all non-used byproduct is typically removed <br />daily. <br />7.3 Chair Mulder and Member Bakert�an asked about Terminal Road and whether its design <br />can support the vehicles being considered for the project. Deb Bloom, City Engineer <br />stated that Terminal is designed appropriately, but that portions will be under <br />construction later this year. <br />7.4 Member Pust asked about hours of operation and noise generation. Thomas Paschke, <br />City Planner, indicated that all equipment will meet MPCA noise standards and that if <br />there is an issue, adjacent business will notify the City and an inspection will occur. <br />�']� ! f:l i: �C':� f�� R��.;.[t��•. Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.