My WebLink
|
Help
|
About
|
Sign Out
Home
2005_0314_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_0314_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 2:13:47 PM
Creation date
9/14/2009 9:59:57 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TI. PROJECT COSTS <br />The estimated costs discussed are preliminary only. We still need to complete additional <br />geotechnical exploration and engineering for the realignment alternate prior to developing <br />plans and specifications. <br />(1)Existing <br />(2} R�al�gnment <br />(3) Realignment <br />(excavation) <br />Road Pathway Storm Sewer Total <br />$876,00491 $86,800.00 $187,000.00 $1,149,80491 <br />$1,132,408.77 � $87,655.00 � $209,827.56 � $1,429,89133 <br />$�,362,$95.91 I $$7,�55.0� � $209,827.56 . $1�660,378.47 <br />Because the Project may be financed using a combination of Assessments, City Infrastructure <br />funds, and Municipal State Aid funds, each of these will be discussed in turn, beginning with <br />assessments. <br />III. ASSESSMENTS <br />Assessments will vary, of course, depending on which design alternative the Council selects and the cost <br />of that design alternati�e. Based upon the City Council's current Assessment Policy, the assessments <br />for South Owasso would be as follows: <br />(1} Reconstruct road in existing alignment: <br />Estimated total assessable cost ..............................................$672,662.50 <br />Estimated total assessable footage ..............................................4,252.62 <br />* Estimated street assessment (25%of 7 ton road cost) $39.45/ foot <br />(2) Reali�n road in accordance with Ladvsli�pper Master Plan — Surchare Option <br />Estimated total assessable cost ..............................................$925,33�.$$ <br />Estimated total assessable footage ..............................................4,252.62 <br />• Estimated street assessment (25%of 7 ton road cost) �54.27/ foot <br />(3) Realign road in accordance with Ladysli�per Master Plan — Excavation O�tion <br />Estimated total assessable cost ...........................................$1,155,81934 <br />Estimated total assessable footage ..............................................4,252.62 <br />Estimated street assessment (25%of 7 ton road cost) $67.95/ foot <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.