Laserfiche WebLink
CONCLUSIONS AND RECOMMENDATIONS <br />Project P-ST-OS-02, Neighborhood 32 <br />CONCLUSIONS: <br />1. All portions of the proj ect as proposed are feasible. <br />2. Projectcosts for P-ST-OS-02, Neighborhoods 32 <br />Total Construction Cost ................................................................ $159,1�5.�9 <br />RECONIN�NDATIONS: <br />]. Construct the proj ects in 2005. <br />�'. Construct the proj ects as proposed in this report. <br />�. Construct �,oveli Avenue to a width of 32 feet. On street parking on both sides <br />of the street. <br />�. Reconstruct Chatsworth Street to a width of 28 feet. On street parking on the <br />west side of the street. <br />5. All properties shall be assessed based on a per foot basis. <br />t�_ Schedule a public hearing for May 9,2005. <br />� <br />