My WebLink
|
Help
|
About
|
Sign Out
Home
2005_0411_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_0411_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 11:47:05 AM
Creation date
9/14/2009 10:00:40 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Westbound TH 36 Ramp/�'airview Avenue <br />o Optimized Cycle lengths, Splits and Offsets <br />o Southbound thraugh/Left set as coordinated phase <br />o Split Phase eastbound and westbound <br />o Protected only northbound and southbound left turns <br />o Lagging southbound left turn <br />� West Mall ����rance/Fairview Avenue <br />o Optimized Cycle lengths, Splits and Offsets <br />� County Road �21�'airview Avenue <br />o Optimized Cycle lengths, Splits and Offsets <br />� County Road B2/We�ls �'argo/Northwest Mall Entrance <br />o Optimized Cycle lengths, Splits and Offsets <br />� County Road 82/�.osedale Commons <br />o Optimized Cycle lengths, Splits and Offsets <br />� County Road FS��'r��n�riG���T�;��h Mall Entrance <br />o Optimized Cycle lengths, Splits and Offsets <br />o Additional 170 foot southbound left turn lane <br />o Lengthen to 300 feet westbound left turn lane <br />� County Road B21Sout�bound TH 51 RamplNortheast Mall Entrance <br />o Optimized Cycle lengths, Splits and Offsets <br />o Eastbound left turn set as coordinated phase <br />o Add 75 foot southbound left turn lane <br />o Lengthen to 340 feet eastbound left turn lane <br />o Rosedale perimeter road transitions to full left turn lane, full through lane and a 400 foot <br />right turn lane (see site plan Figure 1.) <br />• County Road B2INorthbound TH 51 Ramp <br />o Optimized Cycle lengths, Splits and Offsets <br />The Analysis indicated that these traffic improvements would provide the system of intersections <br />sufficient capacity to handle anticipated traffic demand. When looking at Synchro results, some <br />individual movements were reported to have Level of Service (LOS) E and even F. The poor <br />LOS reports were a reflection of the increase in cycle length required to accommodate the traffic <br />volumes rather than insufficient capacity. The SimTraff�c simulation indicates that the system of <br />intersection capacity is capable of servicing the traffic demand. The attached Synchro and <br />Sir�'�'ra�c files were used in the analysis and development of the traffic improvement plan. <br />Attachments (Figures 1 through 5) <br />� <br />■ <br />An [����r,l Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.