Laserfiche WebLink
Rosedale Traffic Improvement Plan Cost Estimate <br />(March 7, 2005: Rosedale Traffic Improvement Plan) <br />Signal Construction ��.0�� <br />Signa� Desian ?7,Q�� <br />Signai auil�ii�� 44,000 <br />Signal Sub-total 126,000 <br />Roadway Construction 118,000 <br />Roadway Design 49,000 <br />Roadway Subtotal 167,000 <br />Total 293,000 <br />i <br />� <br />� <br />