Laserfiche WebLink
Rosedale Center Expansion Traffic Review <br />April 6, 2005 <br />Page 2 <br />plans can he derived from a combination of the latest turning movement counts available and the <br />projected traffic generated by the new development. At a point in time 3 to 6 months after opening day of <br />the development, new turning movement counts will he collected and a"final" set of timing plans will be <br />generated. For each set of timing plans, six different timing plans will be developed, and, at a minimum, <br />timing plans that cover tl�e weekday morning, n�id-day, and afternoon peak periods and the Saturday peak <br />period will be provided. The estimated cost for development and imple�ner�tatioil of the interim timing <br />plans, collection of post-development turning movement counts, and development and implementation of <br />final timing plans is $50,000. <br />The total cost of all tlae off-site roadway improvements required for proposed re-developmentlexpansion <br />of the Rosedale Center is estimated to be $355,000. <br />�: �il� <br />. �y�,q�.,rswaion,ti.r� ����w�.�waaz �..d w.�o�.ti.v �+►.+a.. r.�r.ra+v'�'•i•c <br />