Laserfiche WebLink
Rqsedale Traffic ImprovementPlan Cost Estimate <br />(March 7, 2005: Rpsedale Traffic Improvement Plan) <br />Signal Construction ��.��� <br />Signal Design �2 00�� <br />Signal ��mm�s 44,000 <br />Signal Sub-total 126,000 <br />Roadwav Construction 118.000 <br />Roadway Design 49,004 <br />Roadway Subtotal 167,000 <br />Total 293,000 <br />