Ros�da�e Center Expansion Traffic Review <br />April 6, 2005 <br />Page 2 <br />plans can be derived from a co►nbii�atio�� of the latest turning movement counts available and the <br />projected traffic generated by the new development. At a point in time 3 to 6 months after opening day of <br />the development, new turning movement counts will be collected and a"final" set of timing pians will be <br />generated. For each set of timing plans, six different timing plans will be developed, and, at a minimum, <br />timing plans that cover the weekday morning, mid-day, and afternoon peak periods and the Saturday peak <br />period will be provided. The estimated cost for development and implementation of the interim timing <br />plans, collection of post-development turning movement counts, and development and implementation of <br />final timing plans is $50, 000. <br />The total cost of all the off-site roadway improvements required for proposed re-deveiopmentJexpansion <br />of the Rosedale Center is estimated to be $355, 000. <br />�� 1M�4 <br />� �+ wvK+i9o�9Qrvmk r� rcwilYA.�6�ro rsvicd �nqnvK �Yeii{Ca�i*ao wibod Jx <br />