My WebLink
|
Help
|
About
|
Sign Out
Home
2005_0509_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_0509_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 11:10:10 AM
Creation date
9/14/2009 10:01:52 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit F Landscape Plan including materials list, sizes, and locations of all plant <br />materials (Drawing No. GS), dated March 8, 2005. <br />Exhibit G Building floor plans with dimensions of the facility (Drawings No. A-1 & <br />A-2, dated March 7, 2005. <br />Exhibit H Building elevations with dimensions and materials identified (Drawings <br />No. A-3 & A-4), dated March 24,2005. <br />Exhibit I Anticipated site development schedule with estimated date of <br />construction start, construction completion, utility, curb, gutter and <br />landscape installation, and tentative occupancy date, dated <br />,2005. <br />Exhibit J Public Improvements Contract approved by the City stipulating all <br />requirements, terms, easements, and conditions with respect to public <br />improvements including (but not limited to) any utility, roadway, pathway, <br />storm water ponding, and boulevard restoration, dated „_- 2005. <br />Exhibit K Snow Storage and Management Plan shall include staging locations for <br />temporary snow storage and the manner in which snow is transferred to <br />the melting machine. No temporary accessory fuel storage tar�k for the <br />operation of the snow melting machine shall be permitted on premises, <br />dated ,2005. <br />5.0 PLANNED UNIT DEVELOPMENT AMENDMENT: <br />The CITY conducted a hearing on December 1,2004 (Planning Commission - PUD <br />Amendment and Concept Development Plan). On December 20,2004 the City Council <br />considered the proposed concepts within the Planned Unit Development zone and found <br />the concepts to be consistent with the City Comprehensive Plan and City Code. The <br />CITY agrees to amend the PUD (established January 1, 2000}, subject to the <br />DEVELOPER's strict compliance with the approved plans, and terms and conditions of <br />this AGREEMENT. <br />Minor departures from the approved final development plans, which are consistent with <br />this AGREEMENT and the underlying Shopping Center District zone and/or the <br />Rosedale Shopping Center PUD amendment may be approved by the CITY's <br />Development Review Committee and the Community Development Director or designee, <br />as provided in the Roseville City Code (Section 1008). Substantial departures from the <br />approved final development plans will require an amendment to the Planned Unit <br />Development in accordance with Sections 1004,1008, 1010,1012 and 1015 of the <br />Roseville City Code. Where not superseded by more restrictive requirements of this <br />PUD, the standards of the underlying zones shall apply, as stated in Chapter 1004 of the <br />Roseville City Code. Whether an issue is "minor" or "significant" shall be determined by <br />the CITY as defined in Section 1008.09 of the City Code. <br />
The URL can be used to link to this page
Your browser does not support the video tag.