Laserfiche WebLink
For any improvements not contemplated in this AGREEMENT, the CITY may require <br />compliance with any amendments to the Comprehensive Guide Plan, official controls, <br />platting or dedication requirements enacted after the date of this AGREEMENT. <br />4.0 APPROVAL by the CITY: <br />The CITY hereby approves the following plans and agreements (as Exhibits to the ['l � L� <br />AGREEMENT) on file with the City. The DEVELOPER shall develop the subject <br />property in accordance with these plans and agreements. If, however, the plans or <br />agreements are inconsistent with the written terms of this AGREEMENT, the written <br />terms of this AGREEMENT shall control. If the plans address items not specifically <br />addressed in this AGREEMENT, the plans shall govern with respect to those items. The <br />plans are: <br />Exhibit A Existing Land Use, Zoning, and Site Conditions Surveys that indicates all <br />conditions on the parcels including buildings and contours, dated January <br />l, 2000, and ,2005. <br />Exhibit B Amended Transit Hub (Center) and Transit Operating Agreements <br />,2005, (signed version to be submitted to the CITY prior to <br />issuance of any DEVELOPER's project building permit). Transit Hub <br />(Center) and Site Plan illustrating addenda (as summarized in the letter of <br />intent dated _, 2005, and staff report dated May 9,2005) for: <br />a) transit bus routes and pick-up and drop-off at main Mall entry; <br />b) hub (center) improvements including bus routes, rider waiting/trans�'er, <br />and driver and customer rest areas, customer shelter, bus waiting areas; <br />c) park and ride lot, and customer shelter. <br />Exhibit C Site Development Plan that includes property boundary, building <br />setbacks, structure location (including the trash enclosure), curbing, <br />parking, parking setbacks, and proof of parking (Drawing No. C-2), dated <br />March 31,2005. <br />Exhibit D Grading and �'onding/Storage Plan illustrating existing grades and those <br />proposed after completion of the proposed construction, drainage <br />directions, spot elevations, catch basins for surface water catchment, <br />ponds and storage basis (at and below surface) and the erosion control <br />plan (Drawing No. C-3), dated March 8, 2005. <br />Exhibit E Utility Plan including sanitary sewer, water mains and hydrants, and <br />storm sewer and illustrating all connections, pipe sizes, line locations, <br />manhole locations, hydrant locations, and other applicable utility plan <br />infarmation (Drawing No. C-4), dated March 8, 2005. <br />