My WebLink
|
Help
|
About
|
Sign Out
Home
2005_0509_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_0509_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 11:10:10 AM
Creation date
9/14/2009 10:01:52 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 22 <br />April 12 <br />OVAL CHILLER REPAIR Tif11��I�IN� <br />(tentative schedule provided by Stevens Engineering) <br />Kick off meeting to begin gathering information for analysis <br />Complete report on analysis and evaluation (DID NOT <br />MAKE THIS DEADLINE) <br />April 25 Present result options to the City Council and receive <br />authorization to proceed with plans, specs and bid <br />advertisement (DID NOT MAKE THIS DEADLINE) <br />May � � <br />June 14 <br />June 20 <br />Plans and specifications complete and advertise for Bids <br />Bid Opening <br />Council awards construction contract (CRITICAL NEXT <br />STEP) <br />June 30 Contractor has contract and orders tubes and equipment <br />Supplier begins setup to start tube manufacturing process <br />(approximately 7 week process) <br />July 11 Contractor begins demolition, testing and removal of old <br />tubes <br />Contractor performs system modifications for monitoring <br />Contractor begins treatment OR removal of contaminated <br />brine <br />August 1� Supplier begins manufacturing tubes and ships to site <br />(Viiter has not confirmed the exact length of the <br />manufacturing process) <br />Installation of tubes begin (approximately 5 weeks to <br />complete process) <br />September 26 Weld piping and end bells <br />Charge system with ammonia and brine (skip if brine not <br />replaced) <br />October 3 <br />October 17 <br />Re-insulate chillerand piping (1-2weeks) <br />Pressure test and certify <br />Start up system <br />
The URL can be used to link to this page
Your browser does not support the video tag.