Laserfiche WebLink
The next step in this process which is part of the original engineering proposal <br />that you approved on March 21 St is to consider the development of plans, <br />specifications and advertising for bids for the total re-tube of the chiller barrel, <br />replacement of the brine in the system, repair of brine pump seals and impellors, <br />peripheral support structures as well the inclusion of alternates for new and <br />improved monitoring equipment. Bid results will be brought back to Council for <br />review and authorization. <br />POLICY OBJECTIVE <br />The proposed project and the use of consultants are consistent with city policy <br />and state law on performing repairs necessary for the safe operation of the City <br />infrastructure. <br />FINANCIAL IMPLICATION <br />The cost for engineering services to develop plans, specifications and advertise <br />for bids as outlined is in the original proposal from Stevens Engineering. <br />STAFF RECOMMENDATION <br />Based upon all of the prior efforts staff recommends that the City proceed to the <br />next step for engineering services which is to develop plans, specification and <br />advertise for bids to re-tube the chiller barrel, replace the existing brine solution, <br />repair seals in brine pumps and to identify and add alternates for newlimpra�ed <br />monitoring equipment that allow closer monitoring of the system. Bid results will <br />be brought back to Council for review and authorization. <br />COUNCIL ACTION REQUESTED <br />Motion authorizin� the Parks and Recreation Department to move forward with <br />Stevens �ri.gi��:�a� to prepare final documents and assist with bidding as <br />outlined in the original engineering proposal that was approved on March 21, <br />2005. <br />