My WebLink
|
Help
|
About
|
Sign Out
Home
2005_0620_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_0620_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 11:57:55 AM
Creation date
9/14/2009 10:02:48 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Add 75 feet to southbound left turn lane <br />Lengthen to 340 feet eastbound left turn lane <br />�asedale perimeter road transition to full left turn lane, full through lane, and a 400 foot <br />right turn lane <br />* County Road B2/NarthBound TH 51 Ramp <br />4 Optimized cycle lengths, splits and offsets <br />The developer has hired Parsons to design the improvements. The City, State and County will work <br />with their Engineer during construction to ensure the improvements are installed according to approved <br />plans and City, State and County specifications. These improvements, once constructed, will be turned <br />over to the State and County. <br />Policy objectives: In order to facilitate this transition and ensure that the improvements are built to Public <br />standards, we have drafted a Subdivision and Public Improvement Contract that lays out all the <br />responsibilities involved with this proposed street improvements. Upon completion of the project, the <br />developer's engineer must provide the City with As-built plans. They must also provide to the City Engineer <br />a letter certifying that the improvements were constructed according to approved plans and specifications, <br />and request that the City accept the improvements. Once the City Council accepts the improvements, the <br />two-year warranty period starts. <br />Financial implications: All costs associated with construction of the new public improvements <br />necessary for this development will be borne by the Developer. Appropriate surety in the form of a <br />Letter of Credit will be provided for all public improvements in the amount of 125% of the construction <br />cost, $293,000 for a total of $366,250. Once the construction of the improvements has been completed <br />and accepted by the City, this Letter of Credit will be released and replaced by a two-year warranty bond. <br />RECOMMENDED COUNCIL ACTION: <br />Approval of �osedale Redevelopment public improvement contract. <br />Prepared by: Debra Bloom <br />
The URL can be used to link to this page
Your browser does not support the video tag.