Laserfiche WebLink
ci ti Conduct public meetings, including informational meetings and meetings <br />with each city council; <br />ti i Prepare plans and specifications; <br />L�� Manage contracts made for completion of the Project and for items outside <br />the Project included in sections 23 and 2.4 hereo£; <br />�4 } Conduct necessary state aid reporting; <br />�ti a Supervise construction, including inspection of the work; <br />i ? Conduct construction surveying; <br />,j ] Prepare as-built drawings; <br />h�� Design utilities, as required; <br />I F Assemble necessary assessment roles. <br />6.2 Roseville may, at its discretion, contract with a qualified third party to conduct or <br />complete any or all of these services. Roseville employees shall be billed at their direct salary <br />expenses, including benefits and applicable overhead. <br />7. DISPUTE RESOLUTION <br />7.1 If a dispute arises between the Cities regarding this agreement or the construction <br />of the Project, the City Manager and City Administrator of each city, or their designees, must <br />promptly meet and attempt in good faith to negotiate a resolution of the dispute. <br />7.2 If the Cites have not negotiated a resolution of the dispute within 3 0 days after <br />this meeting, the Cities may jointly select a mediator to facilitate further discussion. <br />7.3 If a mediator is not used or if the Cities are unable to resolve the dispute within 30 days <br />after the first meeting with the selected mediator, the dispute shall be adjudicated in civil court. <br />8. GENERAL PROVISIONS <br />8.1 All notices under this agreement must be delivered personally or sent by first <br />class mail addressed to: <br />Ifto �Roseville: City Maalager <br />City of Roseville <br />2660 Civic Center Drive <br />Roseville, MN 55113 <br />