City of Roseville 2006 Fee Schedule
<br />Building Permit Fees
<br />City Code Sections; 307,801,802,901, 1014
<br />Building Permit Fee:
<br />Permit fee to be based on job cost valuation. The determination of value or valuation shall be
<br />made by the building officiaL The value to be used in computing the building permit and
<br />building plan review fees shall be the total of all construction work for which the pernlii is issued,
<br />as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning,
<br />elevators, fire-extinguishingsystems and any other permanent equipment.
<br />TOTAL VALUATION
<br />$1(JO to $500.00
<br />$501.00 to $2,000.00
<br />$2,001(JO to $25,000.00
<br />$25,OO1..�� to $50,000.00
<br />$50,001(JO to $100,000.00
<br />$100,001.00 to $500,000.00
<br />$500,001.00 to $1,000,000.04
<br />$1,000,001(JO and up
<br />FEE
<br />$30.00
<br />$30.00 for the first $500.00 �i] us $3.00 for each
<br />additional $100.00, or fraction thereof, to and
<br />including $2,000.00
<br />$76.44 for the first $2,000.00 plus $15.34 for
<br />each additional $1,000.00, or fraction thereof,
<br />to and including $25,000.00
<br />$432.38 for the first $25,000.00 plus $11.18
<br />for each additional $1,000.00, or fraction
<br />thereof, to and including $50,000.00
<br />$709.80 for the first $50,000.00 plus $7.80 for
<br />each additional $1,000.00, or fraction thereof,
<br />to and including $ � 00,000.00
<br />$1,095.6� for the first $100,000.00 �lu� $6.24
<br />�ror each additional $�,000.00, �r fraction
<br />thereof, to and including �50Q,OOO,Qfl
<br />$3,564.86 for the first $500,000.00 plus $5.20
<br />for each additional $1,000.00, or fraction
<br />thereof, to and including $1,000,000.�4
<br />$6,183.06 for the first $1,000,040.�Q Qlus
<br />$9�.16 for each additional $1,00D.00, or fraction
<br />thereof
<br />Other Inspections and Fees:
<br />Inspections outside of normal business hours .. ................ ...... .. ......$55.38 per hour
<br />(minimum charge — two hours)
<br />Re-inspection fees assessed under provisions of the MN State
<br />Building Code .....................................................................$55.38 per hour
<br />Inspectionsfor which no fee is specifically indicated .......................$55.38 per hour
<br />(minimum charge — one-half hour)
<br />Additional plan review required by changes, additions
<br />or revisions to plans .. . . .. . .. .. .. .. .. .. . .. .. .. . .. .. .. .. ... .. .. .. . . .. .. . .. . . .. . ....$55.38 per hour
<br />(minimum charge — one-half hour)
<br />For use of outside consultants for pian checking, inspections
<br />and sizni�aa- costs ............................................................................................Actual costs�
<br />Actual costs include administrative and overhead costs.
<br />
|