My WebLink
|
Help
|
About
|
Sign Out
Home
2005_1121_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_1121_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 2:31:58 PM
Creation date
9/14/2009 10:10:15 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2006 Fee Schedule <br />Demolition Permit Fee: <br />Tenant im.proveamen�/remodali�g prior to building permit $55.00 <br />Structures not connected to utilities $55.00 <br />Residential structures connected to city utilities $110.00 <br />Commercial structures connected to city utilities $250.00 <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electrical Inspector <br />Fire Safe . Ins�ectionFee: <br />An amount equal to eight percent (8°/o) of the amount determined by the Building Permit Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections(Ord. 1237, 3-13-2000, eff. 5-1-2000) <br />Gradin�/Excavatio� Permit Fee: <br />Plan Review Fee <br />50 cubic yards or less. .No fee <br />51 to 100,000 cubic yards —$52.75 for t�e first 10,000 cubic yards, plus $26.25 for each <br />additiona110,000 ��arc�n or fraction thereof. <br />100,001 to 200,000 cubic yards —$288.95 for the first 100,000 cubic plus $14.20 for each <br />additional 10,000 cubic }��e�� or fraction thereof. <br />200,001 cubic yards or more —$430.89 for the first 200,000 cubic yards, plus $7.77 for <br />each additional 10,000 cubic vards or fraction thereof. <br />Other Fees: <br />Additional plan review required by changes, additions or revisions to approved plans <br />(minimum charge — one-half hour) ......... ..........................................$5538 per hour <br />Gradin Permit Fee <br />1 to 1,000 cubic yards —$50.00 for the first 100 cubic yards, plus $17.00 for eac� <br />additional 100 cubic ards or fraction thereof. <br />1,001 to 10,000 cubic yards —$208.34 for the first 1,000 cubic yards, plus $15.54 for <br />each additional 1,000 cubic ards or fraction thereof. <br />10,001 to 100,000 cubic yards —$384.14 for the first 10,000 cubic yards, plus $70.70 for <br />each additiona110,000 c�bic ards or fraction thereof. <br />100,001 cubic yards or more —$984.42 for the first 100,000 cubic yards, plus $39.10 for <br />each additional 10,000 cubic ards or fraction thereof. <br />Other Inspections and Fees <br />1. Inspections outside of normal business hours ............................. .$55.38 per hour <br />(minimum charge — one-half hour) <br />2. Reinspection fees ...... ................ .................... .................. ...$55.38 per hour <br />3. Inspections for which no fee is specifically indicated .................... .$55.38 per hour <br />(minimum charge — one-half hour) <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.