Laserfiche WebLink
♦ ■ i i <br />SUPPORT PLAN <br />Services Provided: The Services provided pursuant to this Agreement are based on the following <br />_ Severity Levels. Each Severity Level defines the actions that will be taken by LETG for Response <br />4 Time, Target Resolution Time, and Resolution Procedure for reported problems by CoR. <br />4 Response Times for Severity Levels 1 and 2 are based upon phone contact by CoR as opposed <br />4 to written contact by facsimile, email, or letter. Resolution Procedures are based upon LETG's <br />4 procedures for Service as described below. Unless otherwise stated, all suspected Residual <br />F Errors will be investigated and corrected from LETG's facilities unless it is determined by LETG <br />that on-site investigation and correction is necessary. <br />Reportinq a Problem. CoR shall assign an initial Severity Level for each error reported, either <br />_ verbally or in writing, based upon the definitions listed below. Because of the urgency involved, <br />4 Severity Level 1 or 2 problems must be reported verbally to LETG's call intake center. LETG <br />4 shall immediately notify CoR if it makes any changes to the Severity Level. <br />4 Status Reports. LETG shall provide verbal status reports to CoR on Severity Level 1 and 2 <br />4 Residual Errors. Written status reports on outstanding Residual Errors will be provided by LETG <br />to CoR's system administrator on a monthly basis. <br />SEVERITY DEFINITION TARGET TARGET <br />LEVEL RESPONSE RESOLUTION <br />TIME TIME <br />1 Total System Failure — occurs LETG shall LETG shall fix or <br />when the System is not provide a cure within 24 <br />functioning and there is no telephone hours of initial <br />workaround; such as when a conference notification by <br />Central Server is down or when within one CoR. <br />the workflow of an entire agency hour of <br />is not functioning. initial voice <br />notification <br />b CoR.1 <br />1 LETG will use its best efforts to provide RPD with a fix or cure within the Target Resolution Time. RPD shall <br />allow LETG timely access to System. Target Resolution Times are not applicable if an error cannot be <br />reproduced on a regular basis on either the LETG or RPD's Systems. Should RPD report an error that LETG <br />cannot reproduce, LETG may enable a detail error capture/logging process to monitor the System. Should LETG <br />determine that it is unable to correct such reported Residual Error within the specified Target Resolution Time, <br />LETG shall assign such personnel necessary to correct such Residual Error promptly. Should LETG, in its sole <br />discretion, determine that such a Residual Error is not present, LETG shall verify; (a) the Software operates in <br />conformity to the System Specifications, (b) the Software is being used in a manner for which it was intended or <br />designed, or (c) the Software is used only with approved hardware or software. The Target Resolution Time shall <br />not commence until such time as the verification procedures are completed. <br />Page 16 of 19 <br />