My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0112_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0112_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 1:06:31 PM
Creation date
12/14/2009 1:39:03 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
1/12/2004
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Panel (15 to 25 membersl will consist of: <br />!} Members drawn from the City Commissions (Chairs or designated representatives of <br />the HRA and Planning, Public WorkslTransportationiUtilities, Parks, and Human <br />Rights Commissions) <br />?� Two representatives from each of four adjacent neighborhoods (Northwest/Brenner, <br />east side of Langton Lake, East of Fairview, and the James Addition). — Refer to <br />Project Area Map Above. <br />�} Business and property owner representatives from within Twin Lakes and, 2 small <br />business owners/operators fro outside of Twin Lakes Business Park, and a staff <br />member representing the Roseville Visitor's Association (RVA). <br />�} One at-large member — a Roseville resident who does not live in the affected <br />neighborhoods. <br />The City's government partners (EPA, MnPCA, MnDOT, MnDNR, Metro Council, Ramsey <br />County, and the 35 W Corridor Coalition) will act as resources to the Panel. <br />The Developer and sub-developers will also act as advisory resources to the Panel. <br />The first meeting (in January or February 2004) will be scheduled as an open house educational <br />session. Please note that while all of the meetings will be open to the public, they will not be <br />public hearings. The facilitatorand staff will strive to provide sufficient copies of informational <br />materials for interested members of the public who may attend. There will also be a part of each <br />agenda where the general public can ask questions and offer brief comments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.