My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0209_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0209_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 11:41:48 AM
Creation date
12/14/2009 1:40:07 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regular City Council Meeting — O1/26/04 <br />DRAFT Minutes - Page 28 <br />Milton <br />Residents east of Fairview �2) Cline <br />� Cummings <br />� V�r'ITH]3kF.�+ <br />� Hewitt <br />L_ J �hnsa�ti <br />Sulli�an <br />James Addition Residents (2) N���«n <br />S�nd� <br />Christenson <br />At-large Member �Resident outside Twin Lakes McGehee <br />f�ci ghhx�nc��r�d5 ]��} K s 1 c <br />Holtz <br />Roe <br />Rustad <br />RosevilleSmallBusiness Members (2) Larson <br />��L] <br />�'��d �]� <br />Twin Lakes Business or Properiy Owners (8) ,f ��hann��� <br />f��mu l� <br />In an unrelated note, Mayor Klausing requested that City <br />Manager Beets meet with Ms. Ihlan for her preferences for her <br />swearing-in ceremony. <br />10. Hear a Report about 2004 Public Works Projects <br />Public Works Director Duane Schwartz briefly updated <br />Councilmembers on a potential 2004 Public Works Work Plan; <br />noting changes from the previously-presented Capital <br />Improvement Plan for various reasons. <br />Various recommended improvements included pathway and <br />parking lot rehabilitation; drainage problems; utility <br />infrastructure rehabilitation; interagency participation; <br />neighborhood 19/22, South Owasso Boulevard reconstruction; <br />neighborhood 10 street reconstruction; neighborhood 24, <br />Terminal Road pavement rehabilitation; neighborhood 32, street <br />reconstruction. Mr. Schwartz also identified the funding sources <br />and estimated construction costs for the specific projects, for a <br />proj ected estimated cost of $1,005,000. Mr. Schwartz reviewed <br />those proj ects that were recommended for deferral to 2005 or <br />later construction seasons in an effort to implement smaller <br />proj ects into a more comprehensive proj ect to reduce costs. <br />Hear a Report <br />about 2004 Public <br />Works Projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.