Laserfiche WebLink
REQUEST FOR COUNCIL ACTION <br />DATE: 02/9/04 <br />ITEM: 3.2 <br />Department Approval: A'I$r����r �e��icw���l: Agenda Section: <br />� <br />— �� �� � �.�i7�e�71 <br />Item Description: Approving Additional Change Orders to the City's ConstructionProject <br />Background: The building proj ect continues to progress with an expected move in date for the <br />Police Department in mid-May. The Public Works vehicle storage area is now occupied, and we <br />are beginning to move into the vehicle maintenance area as well. The new maintenance offices <br />will be complete in approximately2-3 weeks. The remodel of the locker rooms and Park <br />Maintenance area will follow throughout March. As with any proj ect of this nature, we continue <br />to identify unforeseen constructabilityissues and some inconsistencies in the drawings and field <br />conditions. Some of the changes are due to conditions encounteredtying into the existing City <br />Hall. Staff has also identified changes necessary for efficient future operations as we see the new <br />spaces develop. We have written appropriate change orders to contracts to reflect such. <br />Discussion: The following are the change orders we are requesting at this time and a brief <br />description of each. These changes are necessary to construct the proj ect under existing building <br />codes and to result in a project that is functional for the users and have the longevity expected of <br />a public building. The following change orders are recommended for approval at this time. <br />Adolfson & Peterson Add $29,617.00 <br />This change order reflects additional height for the brick screen wall around the emergency <br />generator for City Hall. The other items contained in this change order are for minor <br />modifications due to field conditions tying into the existing building and other detail <br />problems encountered during construction. It also includes charges for additionalwinter <br />construction for masonry. This is necessary to keep the proj ect on schedule. A portion of this <br />change order will be backcharged against other contracts due to delays or errors. <br />American Structural Metals Add $ 24,812.00 <br />The changes to this contract reflect extra steel needed to adequatelytie the buildings together <br />and to rectify constructabilityissues per the Structural Engineer. <br />Harmon, Inc. Add $854.00 <br />This change order represents minor glass changes for the proj ect. <br />Northern Air Corp. Add $38,174.00 <br />This change order reflects additional requirements for the fire sprinkler systems, additional <br />fire dampers in ductwork, and an additional control panel for the heat system in the <br />