My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0308_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0308_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 2:16:34 PM
Creation date
12/14/2009 1:40:21 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 1,2004 <br />Mr. Jeff Evenson <br />Park Project Coordinator <br />City of Roseville <br />Fairview Community Center <br />L�1� West CountyRoad B <br />Roseville, MN 55113 <br />Phone: 651-792-7107 <br />Fax: 651-��2-7100 <br />SUBJECT: ROSE OVAL ARENA <br />PROPOSAL #PO4-7446R <br />Dear Mr. Evenson: <br />� � <br />S�EC <br />lNC: � <br />P400 Prior Averx.ie No. <br />St. Paul, MN 55113 <br />(651) 639-0644 <br />vuvuw.roohpec.c�om <br />rn our conversation on February 17,2004, you requested that we revise our scope of work relative to <br />our specification and design proposal of January 20,2004. <br />Within our conversation, you stated that the specifications should instruct the contractor to include all <br />mechanical disconnects and reconnects in their proposal. Further, the specifications are also to identify <br />and define any interiorprotection necessary. Also, liquidated damages would be assessed if the <br />contractors were to exceed the anticipated deadline for completion of the re-roofing. Further, the <br />selected roofing contractor will be responsible for reporting deck remediation and repairs to Beezer <br />International in compliance with their payment requirements. <br />SPECIFICATIONAND DESIGN: <br />The design phase of your specification will be initiated by performing a drafting survey of the entire roof <br />area. Within the course of the drafting survey, test cuts of the membrane will be obtained at all the <br />various details in order to verify the existing roof inembrane components and their thicknesses relative <br />to perimeter wood blocking. Samples of the membrane and base flashings will be obtained for <br />asbestos testing by a certified environmental laboratory. <br />St. Paul, Minnesota <br />Elmiro, New Ya1c <br />• CONSULTIVG • SPECFIGATIONS • DESIGN • CONSTRUCTION MANAGENIEM • IVSPECTIONS � TESTING <br />All awri4�iwn and rscommsndodo� ars submittsd cs the canRdan8al propsrty ofour disnts. Any copiss a- sxtrocdons are rcurvad psnding our writtsn approvoL <br />
The URL can be used to link to this page
Your browser does not support the video tag.