My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0315_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0315_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 2:48:41 PM
Creation date
12/14/2009 1:40:26 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Construction cost: The city's matching construction cost is estimated to be $450,000. <br />This cost is significantly l,e�ss than the estimated e�sting infrastructurereplacement <br />costslneeds discussed in the previous section. <br />� On.°�� maintenance cost: The City has appro�mately 60 miles of e�sting off road <br />pathways and sidewalk Our yearly cost for these facilities is appro�mately $4000/mile <br />for maintenance, upkeep, and replacement. This proposed pathway would add 3.25 <br />miles to the overall City pathway system. <br />• Ri�ht- Of- �T���� Acc�uisition: These costs are not eligible for federal funding and would <br />be a cost we would need to address. We have not finalized the alignment of the pathway <br />at this time; and until this is established, we are not able to confidently estimate right- <br />of- way costs. <br />Proposed Funding Sources for City Costs <br />Staff has identified three possible sources for the city costs related to this project. They are <br />as follows: <br />- Pathwav Maintenance Funds: $140,000 <br />Existing pathways in this corridor are planned for replacement at this time. This amount <br />would be captured from the 2004 and 2005 annual budgets. <br />- Storm Utility Funds: $100,000 -$200,000 (amountto be identified by actual storm sewer <br />needs) <br />This corridor has existing storm drainage needs. If the trail is not constructed, the storm <br />utility would fund these improvements in the future as they are undertaken. <br />- Construction Funds: $200,000 -$300,000 (Depending on right-of-way needs) <br />Staff feels the Construction Fund could absorb the remaining city match and right-of- <br />way costs. <br />■ Existin� En�ineerin� Bud�et: <br />The majority of the engineering and construction administration will be done by existing <br />staff. <br />Process: We will meet with corridor property owners to help us identify issues and address the <br />concerns that they might have. We have met with the following commissions to have them <br />comment and make a recommendation on the proposal: <br />
The URL can be used to link to this page
Your browser does not support the video tag.