Laserfiche WebLink
It is considered in the public's best interest for the <br />State to provide a new cabinet and control equipment to operate <br />the new Traffic Control Signal. <br />The City and the State will participate in the cost, <br />maintenance and operation of the new Traffic Control Signal and <br />EVP System. <br />CONTRACT <br />1. The State will prepare the necessary plan, <br />specifications and proposal, (Preliminary Engineering). The <br />State will also perform all necessary construction inspection, <br />(Construction Engineering). <br />2. The Cost of Construction, (Construction Cost) <br />consists of the contract cost of the work or, if the work is not <br />contracted, the actual cost of all labor, materials, and <br />equipment rental required to complete the work. Construction <br />Cost does not include the cost of providing the power supply to <br />the service pole or pad. <br />3. The State, with its own resources or by contract, <br />will remove the existing traffic control signal and install a <br />new Traffic Control Signal and EVP System on Trunk Highway <br />No. 51 (Snelling Ave.) at Lydia Ave. pursuant to State Project <br />No. 6216-118. Estimated Construction Cost is $219,000.00 which <br />�#�3 ; �1� <br />-�- <br />