Laserfiche WebLink
includes a lump sum amount of $19,000.00 for State furnished <br />Materials. State's share is 50 percent. City's share is <br />50 percent. <br />4. Upon execution of this agreement, award of the <br />Construction Contract, and receipt of State's written request, <br />the City will make an advance payment to the State of its <br />project costs. <br />following: <br />5. <br />The City's project costs will be the sum of the <br />a. The City's share (as specified in <br />Paragraph 3) based on the actual bid prices <br />and the lump sum State furnished Material <br />costs. <br />b. Eight percent of its share [Item (a) above] <br />for the cost of Engineering and Inspection. <br />Upon completion and final State acceptance of the <br />project, the City's final project costs will be the sum of the <br />following: <br />a. <br />Q <br />The City's share (as specified in <br />Paragraph 3), based on the actual <br />Construction Cost and the lump sum State <br />furnished Materials costs. <br />Eight percent of its final share [Item (a) <br />above] for the cost of Engineering and <br />Inspection. <br />d��'��R <br />_�. <br />