My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0426_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0426_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 4:40:33 PM
Creation date
12/14/2009 1:40:55 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department Approval: <br />/' <br />REQUEST FOR COUNCIL ACTION <br />Manager Reviewed: <br />_ _i_/ i <br />DATE: 04l26/04 <br />ITEM: 7. <br />Agenda Section: <br />Item Description: Approving Additional Change Orders to the City's Construction Project <br />Background: The building project continues to progress with an expected move in date for the <br />Police Deparhnent in early May. The Public Works vehicle storage area, maintenance offices and <br />vehicle maintenance area are now occupied. The remodel of the locker rooms and Park <br />Maintenance area are nearly complete. Landscaping and additional parking lot construction are <br />now underway. We continue to identify unforeseen constructability issues and some <br />inconsistencies and omissions in the drawings and field conditions. Some of the changes are due <br />to conditions encountered tying into the existing City Hall. Staff has also identified changes <br />necessary for efficient future operations as we see the new spaces develop. We have written <br />appropriate change orders to contracts to reflect such. <br />Discussion: The following are the change orders we are requesting at this time and a brief <br />description of each. These changes are necessary to construct the project under existing building <br />codes and to result in a project that is functional for the users and have the longevity expected of <br />a public building. The following change orders are recommended for approval at this time. <br />Bartlev Sales Companv, Inc. Add $ 362 <br />Add one detention shower seat at the shower in the detention area, as called out in PR #5. <br />Add $ 362 <br />Steinbrecher Paintin�, Inc. Add $ 194 <br />Add for additional paint at soffits per ASI #21. Add $ 260 <br />Deduct painting where acoustic ceiling is being added, as shown in PR #36. Deduct $ 66 <br />Cosnev Corp. Inc. Add $ 295 <br />Change the food area cabinets from 12" deep to 14" deep. Add $ 295 <br />Central Wire and Iron Works Add $194 <br />Because of existing ductwork, the wire mesh partitions had to be modified and as a result, <br />more material was added. Add $ 194 <br />
The URL can be used to link to this page
Your browser does not support the video tag.