Laserfiche WebLink
Adolfson & Peterson Add $ 2,881 <br />Deduct for Alternate #6 which was approved and awarded to A& P in Change order #1. <br />This work will no longer be completed by A& P. Deduct $18,990 <br />Add for the cost of the brick, brick mortar and limestone already purchased from A& P for <br />Alternate #6. These materials will be turned over to Northland Concrete and Masonry for <br />their use in constructing the generator screen wall. Add $ 5,589 <br />Deduct for PR #14 which added some block and brick to the generator screen wall called out <br />in Alternate #6. This work will no longer be completed by A& P. Deduct $ 2,472 <br />Add for additional general conditions since the time to install the masonry exceeded what <br />was shown on the schedule. Add $ 4,500 <br />Add to fire-caulk the top of the wall on the South side of Room 1113 in the PW Building. <br />Add $ 440 <br />Grout the overhead door frames in the Public Works Building. It had been recognized earlier <br />that this work had been missed, and a bid was requested from A& P. A& P Submitted a <br />not-to-exceed amount of $ 8,747, which was included in the budget. The actual cost for this <br />work was $ 4,027. Add $ 4,027 <br />Add toothing-out of block at doorways cut into existing masonry. The demolition contract <br />did not call for this to be done by the demolition contractor, the only way to do this work <br />correctly was to have A& P tooth-out the openings. This amount of $9,787 also included <br />time for infilling around door frame #L112A in the PS Building, as well as patching block <br />around the added steel joists in the PW Building. Add $ 9,787 <br />Steenberg-Watrud Construction Add $ 4,822 <br />Add for additional concrete sidewalk at the South side of the fire station per PR #9. <br />Add $1,495 <br />Add for concrete patching due to the request of the Minnesota Department of Health, as <br />called out in PR #23. Add $ 710 <br />Due to the incorrect placement of the rolling file storage blockouts, VCT had to be added to <br />the areas where the concrete was patched. These areas included Rooms 127, 128 and 142. <br />The total add from the VCT supplier was $ 2,407 installed. Also, due to not providing a <br />recess in the concrete topping for the recessed mats in vestibules, paver tile borders had to be <br />installed to create a recess. The total add from the tile supplier, including the deduct for the <br />called out VCT, was $ 341 installed. Deduct $ 2,748 <br />During the erection of the precast plank, it was discovered that there was a"hump" in the <br />poured concrete wall that had to be removed prior to setting the precast. Since Steenberg was <br />not on site, A& P was asked to do this work. See the extra work order from A& P dated <br />10/'7/03. The total time was 4 hours for 1 person (4 x$63.03/hour -$252.12). Deduct $ 252 <br />