Relocate an electrical outlet as called out in ASI #24. ADD $ 3 7 5 <br />Add to Collins for the overcurrent protection as called out in RFI #312. ADD $ 6 0 0 <br />Right-Wav Caulkin�, Inc. Add $5,393 <br />Add for Alternate #6 to caulk at the generator screenwalL ADD $10 0 <br />Alternate #SD and #7 were not accepted by the owner. ADD $ 0 <br />Right-way had submitted a bid to caulk the concrete slab-on-grade where it met the precast <br />walls. ADD $ 0 <br />Add to furnish and install the expansion joint in the new Public Safety Building as called out <br />in PR #11. ADD $5,293 <br />Financial Implications: A contingency budget was reserved within the proj ect budget for <br />unforeseen conditions, design problems, and constructioncomplications. The approximate <br />contin�ency remainin� is $190,000 after all potential changes are considered at this time. We <br />anticipate some additional unforeseen conditions as we continue the remodel of the existing city <br />hall. We feel this amount is adequate to complete the project at or below budget. <br />RECOMMENDED COUNCIL ACTION: <br />Motion to approve the following change orders to the contracts of: <br />Spectra Contract Flooring <br />Kendall Doors & Hardware <br />Collins Electric <br />Right-Way Caulking, Inc <br />Add $6,495 <br />Add $ 13,568 <br />Add $29,383 <br />Add $ 5,393 <br />and to approve Landscape Alternates 4B, 4J, 4A, 4F, and 4G. <br />Prepared By: Duane Schwartz <br />